Kharkiv Turbo Engineering

An Impact on the World of Energy Production by Using a Green Energy in Order to Save The Environment

Kharkiv Turbo Engineering

We Renovate Old Hydroelectric Plants by Using New Technologies, but Keeping in Mind the Knowledge from Previous Projects

Kharkiv Turbo Engineering

We Provide Audits for Energy Efficiency, Equipment Reliability and Ecology Influence

Our core features
Innovation

Innovation

We provide development of projects for high performance hydro turbines, such as Kaplan and Francis, and pre-turbine valves, as well as calculations to verify the efficiency and performance of hydro turbine equipment by using Computational Fluid Dynamics (СFD) methods

Expirience

Experience

Since 2003, the company has successfully implemented more than 12 projects of hydro turbine equipment for new HPPs and the modernization of existing HPPs in Europe, Asia, Africa, Central and South America, with a unit power from 2 MW to 345 MW. Dozens of tests were carried out at HPPs with control of the vibration state of the units and technical condition assessment (the total number of tested turbines exceeded 100 units)

Flexibility

Flexibility

We always aim for a maximum satisfaction of our customers, so we’re always open for communication and use the best

Take a look at our work
+

Ukraine

Developing turbines that can successfully work and be adapted to the particularities country

Dniestrovskaya Pump-Storage Plant : Model testing of hydraulic machine at lowered (start-up) heads in pumping and transition modes.

Dneprovskaya HPP-1: Vibration state determination of hydro turbines under plant unit Nos. 1, 2, and 3 prior to modernization, including transition modes; Complex vibration tests on modernized hydraulic units under plant unit Nos. 5 and 9.

Dneprovskaya HPP-2: Vibration state evaluation of hydraulic units under plant unit Nos. 11, 12, 13, 14, 15, 16, 17, and 18, including in transition modes after prolonged operation; Vibration state evaluation of hydraulic units under plant unit No. 18 after major overhaul.

Dneprodzerzhinskaya HPP: Vibration state evaluation of modernized plant unit No. 5.

Kakhovskaya HPP: Vibration state evaluation of hydraulic units under plant unit Nos. 1, 2, 4, and 5 prior to modernization; Vibration tests of hydraulic units after modernization; Full-scale index tests with optimum on-cam relationship determination at hydraulic units under plant unit Nos. 5 and 6; Full-scale vibration testing and dynamic balancing of the hydraulic unit under plant unit No. 3.

Krasnooskolskaya HPP: Development of detail design for modernization; Designer's supervision of equipment manufacture; Erection supervision, precommissioning works and full-scale tests of modernized unit; Commissioning of hydraulic unit under plant No. 2.
Kaplan type turbine

Dneprovskaya HPP-2 buffer plant: Optimum on-cam relationship determination and vibration state evaluation at lowered heads of hydro turbine under plant No. 3.

Aleksandrovskaya HPP: Vibration testing of hydraulic unit under plant unit No. 1 prior to and after repair.

+

Tajikistan

New sources were built for those regions that were impossible to reach

Golovnaya HPP: Detail design development for hydro turbine modernization; Full-scale vibration testing of hydraulic units under plant unit Nos. 1, 2, 3, 4, 5, and 6; Tests with optimum angle setting determination of hydro turbine runner blades at plant unit No. 5.

Nurekskaya HPP: Investigation of technical condition of hydro turbines at hydraulic units under plant unit Nos. 1, 2, 3, 4, 5, 6, 7, 8, and 9; Dynamic balancing of the hydraulic units under plant unit Nos. 4 and 9; Pulsationtestingofhydraulicunitsunderplant unit Nos.2 and 4. Detail design development for hydro turbine modernization; Designer’s supervision ofmanufacture and modernization of hydroturbines under plant unit Nos. 3 and 8; Pre-commissioning works at hydraulic unit under plant unit No. 3; Commissioning of hydraulic unit under plant unit No. 3; Complex testing of hydraulic unit under plant unit No. 3; Pre – commissioning works of unit No 3; Commissioning of unit No 3; Complex tests unit No 3.

Kajrakumskaya HPP: Investigation of technical condition and full-scale vibration testing of hydro turbines under plant Nos. 1, 2, 3, 4, 5, and 6.

Baipazy HPP: Full-scale vibration testing and dynamic balancing of the hydraulic units under plant unit Nos. 1, 2, 3, and 4.

+

Brazil

Boosting the turbines’ efficiency up to 20%

Corumba-3 HPP: Development of detail design; Equipment erection supervision and pre-commissioning works on hydraulic units under plant Nos. 1 and 2; Full-scale tests, including index tests of hydraulic unit under plant unit No. 2; Commissioning of hydraulic.

Sao Joao HPP: Model acceptance tests; Development of detail design.

Nova Aurora HPP: Development of hydro turbine detail design; Equipment erection supervision.

Goiandira HPP: Development of hydro turbine detail design; Equipment erection supervision and pre-commissioning works.

+

Russia

Work that was done without harming the environment

Byelorechenskaya HPP: Development of detail design for modernization; First prototype unit launched.

Vilyuiskaya HPP-3: Pre-commissioning works and vibration testing of hydraulic units under plant unit Nos. 1, 2, and 3.

Kamskaya HPP: Participation in detail design; Random author's supervision of equipment manufacture, contract supervision, pre-commissioning works and full-scale tests on hydraulic units under plant unit Nos. 17 and 23; Random author's supervision of equipment manufacture for hydraulic units under plant unit Nos. 22 and 10.

+

Panama

Delivering efficient hydroelectric turbines for plants in different

Bajo de Mina HPP: Development of hydro turbine detail design; Author's supervision of manufacture; Equipment erection supervision; Pre-commissioning works, including power-, vibration- and pulsation tests of hydraulic turbines under plant Nos. 1 and 2; Equipment has been put into guaranteed operation; Tests for output increase over design output, including vibration and index tests of hydraulic units under plant unit Nos. 1 and 2.
Disk match

Baitun HPP: Development of hydro turbine detail design; Author's supervision of manufacture; Equipment erection supervision, pre-commissioning works; Equipment has been put into guaranteed operation.

San Bartolo HPP: Development of hydro turbine detail design; Author's supervision of manufacture;

+

India

The projects completed under difficult conditions, such as high pressure or plain landscape

Kulhal HPP: Development of hydro turbine basic design.

Dhalipur HPP: Development of hydro turbine detail design.

rushydro
Meet our team

Galeechenko Ivan

Commercial Director

Evtushenko Denis

Specialized in system administration, translating, commercial

Sokolov Valentin

Specialized in hydro turbines

Sirenko Oleg

Leading designer